Commercial Construction Projects Nationwide

Terrapin Construction Group delivers design-build, general contracting, construction management, and insulated metal panel installation for commercial, industrial, and specialty facilities across all 50 states.

50
States Licensed
$250M+
Project Value
200+
Projects Delivered
1M+ SF
IMP Installed
Direct answer: Terrapin Construction Group has delivered over 200 commercial construction projects across all 50 states totaling more than $250M in project value, including over one million square feet of insulated metal panel installation. The portfolio spans hospitality (Hotel ZaZa, InterContinental SF), healthcare and dental (DaVita 25-location rollout, Advantage Eye Care), cannabis and CEA (Vireo Health, Southern Sky, 116,000 SF design-build), industrial (NREL, PEPSICO), data centers, life sciences and pharma cleanrooms, and multifamily. Most recent: 300,000 SF of data center support buildings north of Dallas, delivered 30 days early. TCG operates as a self-performing IMP installer and design-build GC nationwide. Updated .
Project Spotlight · Just Completed

300,000 SF Data Center Support Campus

North of Dallas, TX · 3 x 100,000 SF PEMBs · PEMB Erection & Insulation
Data Center Staging & StoragePre-Engineered Metal BuildingsInsulation

TCG erected and insulated three 100,000 SF pre-engineered metal buildings for the staging and storage campus of a new data center north of Dallas, Texas. Building 1 went from start of steel erection to sign-off in 41 days, and the full 300,000 SF finished 30 days ahead of schedule.

Support buildings have to be ready before the main data hall can move, so every day saved here is a day saved on the critical path. Crews ran early morning and night shifts under light towers to beat the Texas heat, with roof panels, wall cladding, and insulation moving at the same time instead of in sequence.

More on pre-engineered metal buildings, data center construction, and the cost to build a data center.

300,000 SFSupport Buildings Erected
3 x 100K SFClear Span PEMBs
41 DaysBuilding 1, Steel to Sign-Off
30 DaysAhead of Schedule
Pre-engineered metal building steel erection on a data center support campus north of Dallas, Texas, by Terrapin Construction Group
Primary frames going up on one of three 100,000 SF support buildings.
Wall panel installation from a boom lift on a 100,000 SF data center support building
Wall panels going on alongside open steel bays.
Faced blanket insulation installed on a metal building roof for a data center campus
Faced blanket insulation installed with the roof panels.
Night shift roof crew under light towers on a data center staging building
Night shift on the roof to beat the Texas heat.
Roof and wall crews working before sunrise on a data center support building
Roof and wall crews working the same building at once.
Roof insulation crew at dawn on a PEMB data center support building
Roof insulation going down at dawn.
Interior clear span rigid frames inside a 100,000 SF data center support building
Clear span frames, no interior columns.
Rigid frames and purlins over the slab of a data center staging building
Frames and purlins ahead of roof panels.
Wall cladding and overhead door openings on a data center equipment storage building
Cladding complete with door openings framed.
Enclosed data center support building under light towers at night
Building enclosed, final trim under light towers.

Watch the Builds

The two newest TCG Shorts from large pre-engineered metal building projects. Press play to watch here, or open them on YouTube.

Photos: Terrapin Construction Group, August to September 2026. Scope: PEMB erection and insulation.

Advantage Eye Care optical showroom and patient lounge in Owensboro, Kentucky, built by Terrapin Construction Group
Showroom and lounge
Optical dispensary with frame displays and fitting stations at Advantage Eye Care
Dispensary
Custom quartz-top casework refreshment station at Advantage Eye Care
Custom casework
Project Spotlight

Advantage Eye Care

Owensboro, KY · 5,500 SF · Design-Build Tenant Improvement

A full optometry and ophthalmology practice delivered single-source, from shell to patient-ready. TCG handled architectural design, MEP coordination, and construction under one contract.

Scope covered exam lanes built to optometry sight-line and lighting-control requirements, a pre-testing suite, a full optical dispensary with fitting stations, a minor procedure room, and custom millwork throughout. See more on healthcare and medical office construction, or check the optometry office cost guide.

Exam LanesOptical DispensaryPre-TestingProcedure RoomCustom Millwork
Plan a Similar Clinic
Fogo de Chão restaurant entrance and exterior in Phoenix, Arizona, construction managed by Terrapin Construction Group
Fogo de Chão dining room with chandeliers and window wall in Phoenix, Arizona
Dining Room
Fogo de Chão open churrasco grill line in Phoenix, Arizona
Churrasco Grill Line
Project Spotlight · New

Fogo de Chão Phoenix

Phoenix, AZ · Full-Service Brazilian Steakhouse · Construction Management

TCG provided construction management for a full-service Fogo de Chão in Phoenix, coordinating the open churrasco grill line, bar, dining room, and commercial kitchen through opening.

High-end restaurant work is schedule and detail driven: hoods, make-up air, gas, grease systems, and finish quality all have to land on the same opening date. See more on restaurant and hospitality construction and building in Phoenix.

Churrasco Grill LineBarDining RoomCommercial KitchenExterior Facade
Plan a Similar Restaurant
Insulated metal panel cultivation rooms being installed inside an indoor cannabis cultivation facility in Minneapolis, Minnesota, by Terrapin Construction Group
Insulated metal panel walls and ceiling in progress at a Minneapolis indoor cannabis cultivation facility
IMP Install in Progress
Project Spotlight · New

Indoor Cannabis Cultivation Facility

Minneapolis, MN · 50,000 SF IMP · IMP Supply & Install · Urethane Cement Flooring

TCG supplied and installed 50,000 SF of insulated metal panel with doors and hardware to build out the cultivation rooms, then supplied and installed urethane cement flooring.

In a Minnesota winter the envelope does the heavy lifting: continuous insulation and a sealed vapor barrier hold room temperature and humidity against the cold. See more on cannabis facility construction and Minneapolis cannabis construction.

50,000 SF IMPDoors & HardwareUrethane CementCultivation Rooms
▶ Watch the install
Plan a Similar Facility

Case Study Highlights

Click a sector below to explore TCG's project portfolio across the country. The list below is a curated subset, for full case studies, project owner references, or site visit introductions, contact our team.

Hotel renovations and ground-up hospitality builds delivered during continuous operations. Restaurant design-build and rollout work for national QSR and steakhouse brands. See our hospitality construction services.

Construction Management2026
Hotel ZaZa - Austin, TX
Hotel & Hospitality Design-Build24,000 SF
InterContinental Hotel - San Francisco, CA
Hospitality Project Engineering564,614 SF
PF Chang's - Denver, CO
Restaurant Design-Build5,500 SF
Del Frisco's Grille - Woodlands, TX
Restaurant Design-Build3,500 SF
Perry's Steakhouse - Woodlands, TX
Construction Management7,000 SF
3 Forks Steakhouse - 2 Locations, TX
Construction Management15,000 SF
El Pollo Campero - 3 Locations, TX
Construction Management10,000 SF

Healthcare and medical office construction built to OSHPD/ASHRAE/ASHE standards including dialysis centers, dental practices, optometry, and multi-site healthcare rollouts. See healthcare & medical office construction.

Davita Dialysis - 25 Locations in TX
Medical Design-Build75,000 SF
Bellaire Dental - Houston, TX
Dental Design-Build4,000 SF
Vision Source - Sugarland, TX
Construction Management12,000 SF
Advantage Eye Care - Owensboro, KY
Optometry Design-Build5,500 SF
Advantage Eye Care showroomAdvantage Eye Care custom caseworkAdvantage Eye Care dispensary

Cannabis cultivation, processing, and CEA design-build with sealed envelopes, environmental controls, and state regulatory compliance. See cannabis facility construction and controlled environment agriculture.

IMP Supply & Install + Urethane Cement Flooring50,000 SF IMP
Vireo Health - Elk River, MN
CEA Design-Build116,000 SF
Southern Sky - Canton, MS
Construction Management60,000 SF
FLUENT - Tampa, FL
Preconstruction34,000 SF
Agronomia Canna - Mexico City, MX
Agricultural Infrastructure Consulting500,000 SF
Grow Healthy - Lake Wales, FL
Equipment Procurement & Installation55,000 SF
Grospire - Pune, India
Agricultural Infrastructure Consulting300,000 SF
Connecticut Valley Hemp - Saybrook, CT
Agricultural Infrastructure Consulting4,000 SF
Extractioneering - Medford, OR
Construction Management480 SF
Korova Edibles - Oakland, CA
Construction Management2,500 SF
Justice Grown - Ewing, NJ
Construction Administration40,000 SF
CCA - Santa Barbara, CA
Equipment Procurement & Installation5,500 SF
Bristol Extracts - Bristol, NY
Cannabis Facility Design30,000 SF
Holistic Industries - Rockville, MD
Construction Management1,500 SF
Peake Releaf - Hagerstown, MD
Preconstruction140,000 SF
GMNJ - West Amwell, NJ
Construction Administration34,000 SF
Elevated Roots - Kingston, MA
Construction Administration12,000 SF
FireFlower - Albuquerque, NM
Construction Administration5,500 SF
AYR Wellness - Cleveland, OH
Construction Administration60,000 SF
Nebrina - Golden, CO
Construction Management2,000 SF
Canopya - Ordway, CO
Equipment Procurement20,000 SF
JD Meds - Reading, PA
Preconstruction30,000 SF
HIBACA - Sardinia, Italy
Agricultural Infrastructure Consulting20,000 SF
The Hempville - Siler City, NC
Agricultural Infrastructure Consulting3,200 SF
BVC - Bellingham, MA
Construction Administration20,000 SF
Trulieve - Beckley, WV
Construction Administration1,500 SF
Phoenix Life Sciences - Denver, CO
Construction Administration5,000 SF
Vibes Genetics - Caguas, Puerto Rico
Equipment Procurement40,000 SF
Mass Medicum - Holbrook, MA
Construction Administration60,000 SF
Sol Canna - Fulton, IL
Equipment Installation16,000 SF

Industrial, manufacturing, food production, and cold storage with PEMB and IMP envelope systems. See industrial & advanced manufacturing and warehouse & cold storage.

Data Center Staging & Storage Campus - North of Dallas, TX
PEMB Erection & Insulation300,000 SF
Pre-engineered metal building steel erection on a data center support campus north of Dallas, Texas, by Terrapin Construction GroupInterior clear span rigid frames inside a 100,000 SF data center support buildingEnclosed data center support building under light towers at night
150,000 SF Manufacturing Expansion - West Coast
Construction Management150,000 SF
120,000 SF Food Production - Midwest
Design-Build120,000 SF
87,000 SF Industrial Cold Storage - Southeast
Design-Build87,000 SF
NREL Research Facility - Golden, CO
Construction Management55,000 SF
PEPSICO - Blueridge, VA
Light Industrial Design-Build50,000 SF
PEPSICO - Tolleson, AZ
Light Industrial Design-Build34,000 SF
Auto Nation - Dallas, TX
Automotive Design-Build35,000 SF

Edge data centers, colocation facilities, and disaster recovery sites with IMP thermal containment and redundant MEP. See data center & critical infrastructure construction.

Data Center Staging & Storage Campus - North of Dallas, TX
PEMB Erection & Insulation300,000 SF
Pre-engineered metal building steel erection on a data center support campus north of Dallas, Texas, by Terrapin Construction GroupInterior clear span rigid frames inside a 100,000 SF data center support buildingEnclosed data center support building under light towers at night
Enterprise Data Center - Denver Metro
Design-Build8,000 SF
Edge Data Center - Multiple Markets
Preconstruction2,000-5,000 SF/site
Colocation Shell & Core - Southeast
Design-Build45,000 SF
Disaster Recovery Site - Midwest
Construction Management12,000 SF

Pharmaceutical cleanrooms, biotech labs, and compounding pharmacies with cGMP-compliant envelopes and MEP. See life sciences & biotech laboratories.

65,000 SF Pharma Cleanroom - Northeast
Owner's Rep65,000 SF
NREL Research Facility - Golden, CO
Construction Management55,000 SF
Biotech Startup Lab - Denver, CO
Design-Build12,000 SF
Compounding Pharmacy - Multiple States
Equipment Procurement

Multi-specialty animal hospitals, emergency veterinary, and corporate DSO rollouts. See veterinary clinic & animal hospital construction.

Multi-Specialty Animal Hospital - Houston, TX
Design-Build18,000 SF
Emergency & Critical Care - Denver, CO
Equipment Procurement
Corporate DSO Rollout - Multiple States
Preconstruction & GC Services
Veterinary Rehabilitation Center - Southeast
MEP Engineering8,000 SF

Climate-controlled self-storage, drive-up storage, retail-to-storage conversions, and boat & RV storage. See self-storage facility construction.

3-Story Climate-Controlled - Denver Metro
Design-Build85,000 NRSF
Single-Story Drive-Up - Southeast
Design-Build55,000 NRSF
Retail-to-Storage Conversion - Northeast
GC Services40,000 SF
Boat & RV Storage - Texas
PEMB & IMP Design-Build120,000 SF

Multi-site urgent care rollouts, freestanding clinics, retail TI conversions, and pediatric urgent care. See urgent care & walk-in clinic construction.

Multi-Site Urgent Care Rollout - Southwest
Design-Build5,000 SF/site
Freestanding Urgent Care - Denver Metro
MEP Engineering6,500 SF
Retail TI Urgent Care - Houston, TX
GC Services4,200 SF
Pediatric Urgent Care - Southeast
Design-Build3,800 SF

Class A office, medical TI, restaurant rollouts, and retail flagship buildouts. See tenant improvement & commercial buildout construction.

15,000 SF Class A Office - Denver, CO
Design-Build15,000 SF
Multi-Location Restaurant Rollout - Southwest
Preconstruction
Medical Office TI - Houston, TX
Medical TI6,800 SF
Retail Flagship - Multiple Markets
GC Services

Grocery-anchored retail centers, discount grocery + retail, QSR outparcel rollouts, and retail redevelopment. See grocery-anchored retail center construction.

95,000 SF Grocery-Anchored Center - Southeast
Design-Build95,000 SF
Discount Grocery + Retail - Midwest
PEMB & IMP Design-Build37,000 SF
QSR Outparcel Rollout - Multi-State
Restaurant Construction
Retail Redevelopment - Denver Metro
Tenant Improvement65,000 SF

Warehouse-to-brewery, big-box-to-self-storage, historic-office-to-mixed-use, and retail-to-medical conversions. See adaptive reuse & building conversions.

Warehouse → Brewery & Taproom - Denver
Restaurant Construction18,000 SF
Big-Box Retail → Self Storage - Multiple
GC Services40,000+ SF
Historic Office → Mixed-Use - Northeast
Structural & MEP
Retail → Urgent Care - Southwest
Medical Buildout

K-12 and higher-education facilities plus federal and university research labs. TCG serves as owner's representative and construction manager on ground-up schools and occupied-campus additions and renovations, providing third-party oversight of national general contractors (including Gilbane Building Company, Bartlett Cocke, Bellows Construction, and Odell Snyder) from preconstruction through closeout, alongside research project engineering at NREL and Colorado State University.

Trinity School of Midland - Midland, TX
CM / Owner's Representative$32M
Joe Hubenak Elementary - Richmond, TX
Owner's Representative100,000 SF / $22M
Cora Thomas Elementary - Richmond, TX
Owner's Representative85,000 SF / $19M
Aldine Westfield Addition & Renovation - Houston, TX
Owner's Representative$7.5M
CSU Industrial Sciences Lab - Ft Collins, CO
Higher Education Project Engineering7,000 SF
NREL - Golden, CO
Commercial Project Engineering55,000 SF

Multifamily construction with full courtyard amenity build-outs and tenant-ready interiors. TCG leadership also brings direct multifamily renovation experience predating the firm, including value-add repositioning across occupied apartment communities in Texas (references available on request).

Barryknoll - Houston, TX
Multifamily Construction

Watch Our Crews Work

Real TCG job sites, not stock footage. See the full construction video library or our IMP installation services.

2026 turnkey IMP supply and install, indoor cultivation facility in Minneapolis, MN. One of the newest additions to TCG's cannabis & CEA portfolio.

Boots on Every Site

Active Construction Across All 50 States

From a 60,000 SF cold storage envelope in the Southeast to a 564,614 SF hospitality renovation in San Francisco, TCG project teams are on active sites coast to coast. Self-performing IMP crews move with the schedule. Subcontractor networks scale with the scope. Construction management, owner's representation, and preconstruction are all delivered in-house.

Our GC Services →
From Shell to Finish

Tenant Improvements & Multifamily Build-Outs

Hotel renovations during continuous operations. Class A office tenant improvements delivered against aggressive lease commencement dates. Multifamily projects with finishes that hold up to ten-year hold periods. The interior work is where reputations are made, and where TCG's in-house architectural team plus MEP engineering compress schedule risk.

TI & Buildout Services →

Industries We Build For

Sector expertise across every commercial vertical TCG has delivered.

Cold Storage & Food Processing

USDA-compliant cold storage warehouses, blast freezers, food processing plants with FM-approved IMP assemblies.

Cannabis & CEA

Sealed grow rooms, processing facilities, vertical farms with IMP walls, environmental controls, and state regulatory compliance.

Hotels & Hospitality

Luxury hotel renovations, boutique hotel construction, restaurant buildouts delivered during continuous operations.

Healthcare & Medical

Dental offices, optometry clinics, urgent care centers, veterinary hospitals built to healthcare codes.

Warehouse & Industrial

Distribution centers, manufacturing plants, temperature-controlled warehouses. PEMB and insulated panel systems.

Data Centers

Edge data centers, colocation facilities with IMP containment, redundant MEP, and environmental separation.

Where We Build, National Project Coverage

TCG delivers commercial construction in all 50 states.

54 Metro Markets · Denver HQ · 50 States Licensed

Cost Guides & Industry Resources

Up-to-date 2026 commercial construction cost benchmarks and industry analysis from the TCG library.

Frequently Asked Questions

Answers to the questions owners, developers, and partners ask most often about TCG's project portfolio.

What types of commercial construction projects has Terrapin Construction Group completed?
TCG has delivered over 200 commercial construction projects across all 50 states totaling more than $250M in project value, including over one million square feet of insulated metal panel installation. The portfolio spans hospitality (Hotel ZaZa Austin, InterContinental San Francisco), healthcare and dental (DaVita Dialysis 25-location rollout), cannabis and CEA (Vireo Health 116,000 SF, Southern Sky), industrial (NREL, PEPSICO), data centers, life sciences and pharma cleanrooms, veterinary, self-storage, urgent care, restaurants, tenant improvements, grocery-anchored retail, adaptive reuse, and multifamily.
What is TCG's most recent completed project?
In fall 2026 TCG completed three 100,000 SF pre-engineered metal buildings for the staging and storage campus of a new data center north of Dallas, Texas. Building 1 went from start of steel erection to sign-off in 41 days, and all 300,000 SF finished 30 days ahead of schedule. Photos and video are in the project spotlight above. Also recently completed: construction management for a full-service Fogo de Chão in Phoenix, Arizona, and 50,000 SF of insulated metal panel with doors and hardware plus urethane cement flooring for an indoor cannabis cultivation facility in Minneapolis, Minnesota.
How big are TCG's commercial construction projects?
TCG's portfolio includes projects ranging from sub-2,000 SF tenant improvements to ground-up facilities exceeding 500,000 SF. Typical project value range is $1M to $30M with the largest hospitality engagement at 564,614 SF. The cannabis and CEA portfolio includes Agronomia Canna at 500,000 SF and Grospire (India) at 300,000 SF. Industrial projects routinely run 50,000-150,000 SF.
Where does Terrapin Construction Group build?
TCG is licensed in all 50 states and delivers projects nationwide from its Denver, CO headquarters, plus active project teams in 50+ metros including Atlanta, Chicago, Phoenix, Charlotte, Nashville, Tampa, Dallas, Miami, San Francisco, Los Angeles, and New York. International project experience includes Mexico City and Sardinia.
Does TCG self-perform any construction trades?
Yes, TCG is one of the few commercial general contractors in the United States with self-performing insulated metal panel installation crews. IMP crews work directly under TCG project managers, install 800-1,500 SF per day per crew, and have delivered over one million square feet of IMP across all 50 states. All other trades are coordinated through a vetted national subcontractor network.
Has TCG built cannabis cultivation facilities?
Yes, cannabis is one of TCG's largest sector verticals. Completed cannabis and CEA projects include Vireo Health (Elk River, MN, 116,000 SF CEA design-build), Southern Sky (Canton, MS, 60,000 SF construction management), Peake Releaf (Hagerstown, MD, 140,000 SF preconstruction), AYR Wellness (Cleveland, OH, 60,000 SF), Mass Medicum (Holbrook, MA, 60,000 SF), Grow Healthy (Lake Wales, FL, 55,000 SF), Justice Grown (Ewing, NJ, 40,000 SF), a 2026 indoor cultivation facility in Minneapolis, MN (50,000 SF of insulated metal panel with doors and hardware plus urethane cement flooring, supplied and installed by TCG; watch the install), and over 25 other cannabis and CEA engagements.
Does Terrapin Construction Group build hotels and restaurants?
Yes. TCG's hospitality portfolio includes Fogo de Chão Phoenix (construction management, full-service Brazilian steakhouse), Hotel ZaZa Austin (24,000 SF design-build), InterContinental Hotel San Francisco (564,614 SF project engineering), PF Chang's Denver, Del Frisco's Grille Woodlands, Perry's Steakhouse Woodlands, 3 Forks Steakhouse (2 Texas locations), and El Pollo Campero (3 Texas locations). Hotel renovations are typically delivered during continuous operations.
Has TCG worked on healthcare or medical office projects?
Yes, healthcare and medical office projects include DaVita Dialysis (25-location Texas rollout, 75,000 SF medical design-build), Bellaire Dental Houston (4,000 SF), Vision Source Sugarland TX (12,000 SF), Advantage Eye Care Owensboro KY (5,500 SF), 65,000 SF pharma cleanroom owner's-rep work in the Northeast, multi-site urgent care rollouts, and a multi-specialty animal hospital in Houston.
Has TCG completed data center projects?
Yes, data center is an active growth vertical. Most recently TCG erected and insulated 300,000 SF of PEMB support buildings (three 100,000 SF buildings) for a data center staging and storage campus north of Dallas, Texas, delivered 30 days ahead of schedule (see photos and video). Other completed work includes an Enterprise Data Center in Denver Metro (8,000 SF design-build), Edge Data Centers across multiple markets (2,000-5,000 SF per site preconstruction), a 45,000 SF Colocation Shell & Core in the Southeast (design-build), and a 12,000 SF Disaster Recovery Site in the Midwest.
What industries does Terrapin Construction Group serve?
Cold storage and food processing, cannabis and CEA, hotels and hospitality, restaurants and QSR, healthcare and medical office, dental and optometry, urgent care, veterinary, life sciences and pharmaceutical, data centers and critical infrastructure, industrial and advanced manufacturing, warehouse and distribution, self-storage, grocery-anchored retail, tenant improvement, adaptive reuse, K-12 and higher education, research, and multifamily and mixed-use.
What is TCG's largest project to date?
By square footage, TCG's largest single engagement is the InterContinental Hotel project in San Francisco at 564,614 SF (project engineering scope). The largest cannabis cultivation engagement is Agronomia Canna in Mexico City at 500,000 SF. The largest domestic ground-up cannabis facility is Vireo Health in Elk River, MN at 116,000 SF (CEA design-build). TCG's IMP installation portfolio totals over one million square feet delivered across all 50 states.
Can TCG provide case studies or references for a specific industry?
Yes. TCG can provide written case studies, project owner references, and site visit introductions for any industry vertical in our portfolio. Contact our team or schedule a meeting to request a tailored case study package matching your project type, scale, and geography. The portfolio shown on this page is a curated subset, our full delivered project list is significantly larger.
Does TCG offer design-build, construction management, and IMP installation under one roof?
Has TCG worked on school or education construction projects?
Yes. TCG provides owner's representative and construction management services on K-12 and education projects, providing third-party oversight of national general contractors from preconstruction through closeout. Engagements include Trinity School of Midland (Midland, TX, $32M, two building additions and chapel rehabilitation on an occupied K-12 campus, GC Bellows Construction), Joe Hubenak Elementary (Richmond, TX, $22M, 100,000 SF ground-up, GC Gilbane Building Company), Cora Thomas Elementary (Richmond, TX, $19M, 85,000 SF ground-up, GC Bartlett Cocke), and Aldine Westfield Addition and Renovation (Houston, TX, $7.5M, new gymnasium plus a two-story addition and renovation on an occupied campus, GC Odell Snyder).

Ready to Build?

Whether you need a general contractor, design-build partner, or IMP installation subcontractor, TCG delivers nationwide.